Minha sacola

    PRECEDENCE AND ARROW NETWORKING TECHNIQUES FOR CONSTRUCTION

    Favoritar
    Ref:
    115730

    De: R$ 3.292,13Por: R$ 2.304,49ou X de

    Economia de R$ 987,64

    Comprar

    Calcule o frete:

    Para envios internacionais, simule o frete no carrinho de compras.

    Calcule o valor do frete e prazo de entrega para a sua região

    Editora
    ISBN
    Páginas
    Idioma
    Peso
    Acabamento

    Sinopse

    Two important scheduling techniques for modern construction management--the precedence technique and the arrow technique--are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager. Introduces the concept of the scheduling plan as a design process. Shows the steps for developing the list of activities as the basis for any networking technique. Gives computations for arrow and precedence diagrams. Covers practical techniques for making time-cost adjustments to early start schedules. Concludes with discussion of applications of techniques in the context of real-life projects.

    Ficha Técnica

    Especificações

    ISBN9780471041238
    Pré vendaNão
    Peso500g
    Autor para link
    Livro disponível - pronta entregaNão
    Dimensões23 x 16 x 1
    Tipo itemLivro Importado
    Número de páginas448
    Número da edição1ª EDIÇÃO - 1978
    Código Interno115730
    Código de barras9780471041238
    AcabamentoPAPERBACK
    AutorHARRIS, ROBERT B.
    EditoraJOHN WILEY
    Sob encomendaSim

    Conheça outros títulos da coleção

      Este livro é vendido

      SOB ENCOMENDA

      Prazo estimado para disponibilidade em estoque: dias úteis

      (Sujeito aos estoques de nossos fornecedores)

      +

      Prazo do frete selecionado.

      (Veja o prazo total na sacola de compras)

      Comprar